Plants
The installation of plants
With ICF REXwall it is possible to economize all the operations for the positioning and installation of the plants, since the use of our System considerably lowers the cost of the masonry assistance. The tracks in the walls, within which to pass the pipes and sleeves of the plants (or to place the small boxes), are created with the help of mechanical/hot cutters that remove the polystyrene without leaving any leftover at the construction site. The possibility of attachment remains still optimal, since once removed the insulation layer, you can directly relay on the concrete. Finally, the tracks have to be sealed with spray foam, that insulates the pipes and levels the surface. The whole procedure is extremely easy and fast, with the advantage that the construction site remains clean.